{"id":1492,"date":"2024-09-11T14:53:42","date_gmt":"2024-09-11T12:53:42","guid":{"rendered":"https:\/\/test.kint.cz\/?p=1492"},"modified":"2025-06-13T11:45:56","modified_gmt":"2025-06-13T09:45:56","slug":"integralni-bezpecnost-pouzita-literatura","status":"publish","type":"post","link":"https:\/\/www.kint.cz\/ca\/integralni-bezpecnost-pouzita-literatura\/","title":{"rendered":"Pou\u017eit\u00e1 literatura pro \u010dl\u00e1nky Integr\u00e1ln\u00ed bezpe\u010dnost"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"1492\" class=\"elementor elementor-1492\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-77acc00 e-flex e-con-boxed e-con e-parent\" data-id=\"77acc00\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-0f41565 elementor-widget elementor-widget-heading\" data-id=\"0f41565\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h1 class=\"elementor-heading-title elementor-size-default\">Pou\u017eit\u00e1 literatura pro \u010dl\u00e1nky Integr\u00e1ln\u00ed bezpe\u010dnost<\/h1>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e656a6a elementor-widget elementor-widget-text-editor\" data-id=\"e656a6a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>[1] KERTIS, T., PROCH\u00c1ZKOV\u00c1, D. Assets of Model Metro Station and Their Criticality. Acta Polytechnica CTU Proceedings. IRICoN. ISSN 2336-5382. ISBN 978-80-01-06022-3. Praha: \u010cVUT 2016, s. 29-37.<\/p><p>[2] PROCH\u00c1ZKOV\u00c1, D. Strategick\u00e9 \u0159\u00edzen\u00ed bezpe\u010dnosti a udr\u017eiteln\u00e9ho rozvoje \u00fazem\u00ed. ISBN 978-80-7251-243-0. Praha: PA \u010cR 2007, 202 s.<\/p><p>[3] KERTIS, T., PROCH\u00c1ZKOV\u00c1, D. Aplikace teorie citlivosti pro zv\u00fd\u0161en\u00ed bezpe\u010dnosti kritick\u00e9 infrastruktury. RRTD 2020. ISBN 978-80-01-06786-4. Praha: \u010cVUT 2020, s. 37-65.<\/p><p>[4] KERTIS, T. Bezpe\u010dnostn\u00ed pl\u00e1n vybran\u00e9 stanice pra\u017esk\u00e9ho metra. Diplomov\u00e1 pr\u00e1ce. Praha: \u010cVUT 2015, 95 s.<\/p><p>[5] KERTIS, T., PROCH\u00c1ZKOV\u00c1, D. Identification of Assets of Metro Operation in Praha and Determination of their Criticality. In: Proceeding of the 29th European Safety and Reliability Conference. Singapore: Research Publishing Services 2019. doi: 10.3850\/978-981-11-2724-3_0621-cd<\/p><p>[6] PROCH\u00c1ZKOV\u00c1, D. Z\u00e1sady \u0159\u00edzen\u00ed rizik slo\u017eit\u00fdch technologick\u00fdch za\u0159\u00edzen\u00ed. 978-80-01-06180-0, e-ISBN 78-80-01-06182-4. Praha: \u010cVUT 2017, 364 s. http:\/\/hdl.handle.net\/10467\/72582<\/p><p>[7] KERTIS, T. Z\u00e1v\u011bre\u010dn\u00e1 zpr\u00e1va \u2013 Bezpe\u010dnostn\u00ed v\u00fdzkum provozu pra\u017esk\u00e9ho metra (2016-2021) (neve\u0159ejn\u00e9). Praha: \u010cVUT 2021, 71 s.<\/p><p>[8] UN Human Security Unit. Human Security in Theory and Practice. New York: United Nations 2009. Dostupn\u00e9 z: https:\/\/www.undp.org\/content\/dam\/turkey\/docs\/news-from-new\u0002horizons\/issue-41\/UNDP-TR-HSHandbook_2009.pdf<\/p><p>[9] UN. Human Development Report. New York: UN 1994. Dostupn\u00e9 z: www.un.org.<\/p><p>[10] NOVOB\u00cdLSK\u00dd, P., KERTIS, T., PROCH\u00c1ZKOV\u00c1, D. Cyber Security of Metropolitan Railway Communication Infrastructure. In: Risk of Business and Territorial Processes. ISBN 978-80-7561-021-8. \u00dast\u00ed nad Labem: FVTM UJEP 2016, s. 78-91.<\/p><p>[11] DPP. 2020 Dopravn\u00ed podnik hlavn\u00edho m\u011bsta Prahy, a.s. [online]. 2020 [cit. 2020-11-28]. Dostupn\u00e9 z: https:\/\/www.dpp.cz\/spolecnost\/o-spolecnosti\/dpp-v\u0002datech<\/p><p>[12] FEMA. Guide for All-Hazard Emergency Operations Planning. Washington, DC: FEMA 1996. Dostupn\u00e9 z: http:\/\/www.fema.gov\/pdf\/plan\/slg101.pdf<\/p><p>[13] PROCH\u00c1ZKOV\u00c1, D. Metodika stanoven\u00ed z\u00e1va\u017en\u00fdch \u017eiveln\u00fdch a jin\u00fdch pohrom pro pot\u0159eby ve\u0159ejn\u00e9 spr\u00e1vy. V: Fire Safety 2004. ISBN 80-86634-43-4 Ostrava: V\u0160B \u2013 Technick\u00e1 univerzita Ostrava, Fakulta bezpe\u010dnostn\u00edho in\u017een\u00fdrstv\u00ed, 2004, 78 s.<\/p><p>[14] PROCH\u00c1ZKOV\u00c1, D. Krizov\u00e9 \u0159\u00edzen\u00ed pro technick\u00e9 obory. ISBN 978-80-01-05292-1. Praha: \u010cVUT 2013, 303 s.<\/p><p>[15] ARCHIV HLAVN\u00cdHO M\u011aSTA PRAHY. Archivn\u00ed katalog [online]. 2020 [cit. 2020-11-28]. Dostupn\u00e9 z: http:\/\/www.ahmp.cz\/<\/p><p>[16] KERTIS, T., PROCH\u00c1ZKOV\u00c1, D. Identifikace aktiv provozu pra\u017esk\u00e9ho metra a stanoven\u00ed jejich kriti\u010dnost\u00ed. RRTD 2018. ISBN 978-80-01-06515-0. Praha: \u010cVUT 2018, s. 92-108.<\/p><p>[17] PROCH\u00c1ZKOV\u00c1, D. Anal\u00fdza a \u0159\u00edzen\u00ed rizik. ISBN:978-80-01-04841-2. Praha: \u010cVUT 2011, 405 s.<\/p><p>[18] KORECK\u00dd, M., TRKOVSK\u00dd, V. Management rizik projekt\u016f. ISBN 978-80-247-3221-3. Praha: Grada 2011, 583 s.<\/p><p>[19] KERTIS, T. Porovn\u00e1n\u00ed p\u0159\u00edstup\u016f pro \u0159\u00edzen\u00ed bezpe\u010dnosti v doprav\u011b. V: Rizika podnikov\u00fdch a \u00fazemn\u00edch proces\u016f a poznatky pro krizov\u00e9 \u0159\u00edzen\u00ed. ISBN 978-80-01-06033-9. Praha: \u010cVUT 2016, s. 34-59.<\/p><p>[20] KERTIS, T., PROCH\u00c1ZKOV\u00c1, D. Tools for Risk Management of Model Metro Station. In: Smart Cities Symposium Prague 2016. ISBN 9781509011162. New York: IEEE 2016.<\/p><p>[21] PROCH\u00c1ZKOV\u00c1 D. Anal\u00fdza, \u0159\u00edzen\u00ed a vypo\u0159\u00e1d\u00e1n\u00ed rizik spojen\u00fdch s technick\u00fdmi d\u00edly. ISBN 978-80-01-06480-1. Praha: \u010cVUT 2018, 222 s. http:\/\/hdl.handle.net\/10467\/78442<\/p><p>[22] PROCH\u00c1ZKOV\u00c1, D., PROCH\u00c1ZKA, J., LUKAVSK\u00dd, J., DOST\u00c1L, V., PROCH\u00c1ZKA, Z., OUHRABKA, L. \u0158\u00edzen\u00ed rizik proces\u016f spojen\u00fdch s provozem technick\u00e9ho d\u00edla b\u011bhem jeho \u017eivotnosti. ISBN 978-80-01-06675-1. Praha: \u010cVUT 2019, 465 s. http:\/\/hdl.handle.net\/10467\/85867, doi:10.14311\/BK.9788001066 751<\/p><p>[23] PROCH\u00c1ZKOV\u00c1, D. Metody, n\u00e1stroje a techniky pro rizikov\u00e9 in\u017een\u00fdrstv\u00ed. ISBN 978-80-01-04842-9. Praha: \u010cVUT 2011, 369 s.<\/p><p>[24] NOV\u00c1K, M., P\u0158ENOSIL, V., SV\u00cdTEK, M., VOTRUBA, Z. Spolehlivost hybridn\u00edho syst\u00e9mu. V: Probl\u00e9my spolehlivosti, \u017eivotnosti a bezpe\u010dnosti syst\u00e9m\u016f. ISBN 80-03298-2-9. Praha: Neural Network World, 2005, s. 23-24.<\/p><p>[25] PROCH\u00c1ZKOV\u00c1, D. Safety of Complex Technological Facilities. ISBN 978-3-659-74632-1. Saarbruecken: Lambert Academic Publishing, 2015, 244 s.<\/p><p>[26] PROCH\u00c1ZKOV\u00c1, D. Z\u00e1klady \u0159\u00edzen\u00ed bezpe\u010dnosti kritick\u00e9 infrastruktury. ISBN 978-80-01-05245-7. Praha: \u010cVUT 2013, 223 s.<\/p><p>[27] PROCH\u00c1ZKOV\u00c1, D., PROCH\u00c1ZKA, J., KERTIS, T. Bezpe\u010dnost slo\u017eit\u00fdch kritick\u00fdch technologick\u00fdch syst\u00e9m\u016f. V: Sborn\u00edk z Mezin\u00e1rodn\u00ed konference Bezpe\u010dnostn\u00ed technologie, syst\u00e9my a management 2015. ISBN 978-80-7454-559-7. Zl\u00edn: Univerzita Tom\u00e1\u0161e Bati ve Zl\u00edn\u011b 2015, 240 s.<\/p><p>[28] ZAIRI, M. Total Quality Management for Engineers. ISBN 9781855730243 Cambridge: Woodhead Publishing Ltd, 1991, 192 s.<\/p><p>[29] PROCH\u00c1ZKA, T. Spolupr\u00e1ce ve\u0159ejn\u00e9ho a soukrom\u00e9ho sektoru. Diplomov\u00e1 pr\u00e1ce V\u0160FS, Praha 2008, 107 s.<\/p><p>[30] KERTIS, T., PROCH\u00c1ZKOV\u00c1, D. Pl\u00e1n \u0159\u00edzen\u00ed rizik spojen\u00fdch s provozem stanice metra. Sborn\u00edk z XXV. Mezin\u00e1rodn\u00ed v\u011bdeck\u00e9 konference soudn\u00edho in\u017een\u00fdrstv\u00ed. ISBN 978-80-214-5321-0. Brno: VUT 2016, s. 399-416.<\/p><p>[31] GLENDON, I. A., et al. Human Safety and Risk Management. ISBN 0-8493-3090-4. Boca Raton: CRC Press 2006, 488 s.<\/p><p>[32] \u010cR. Sm\u011brnice rady 2008\/114\/ES ze dne 8. prosince 2008, o ur\u010dov\u00e1n\u00ed a ozna\u010dov\u00e1n\u00ed evropsk\u00fdch kritick\u00fdch infrastruktur a o posouzen\u00ed pot\u0159eby zv\u00fd\u0161it jejich ochranu. Brusel: \u00da\u0159edn\u00ed v\u011bstn\u00edk Evropsk\u00e9 unie, 2008. Dostupn\u00e9 z: http:\/\/eur-lex.europa.eu\/LexUriServ\/LexUriServ.do?uri=OJ:L:2008:345:0075:0082:CS:PDF<\/p><p>[33] PROCH\u00c1ZKOV\u00c1, D. Bezpe\u010dnost kritick\u00e9 infrastruktury. ISBN: 978-80-01-05103-0. Praha: \u010cVUT v Praze 2012. 318 s.<\/p><p>[34] \u010cR. Z\u00e1kon \u010d. 240\/2000, o krizov\u00e9m \u0159\u00edzen\u00ed a o zm\u011bn\u011b n\u011bkter\u00fdch z\u00e1kon\u016f (krizov\u00fd z\u00e1kon). V: Sb\u00edrka z\u00e1kon\u016f. http:\/\/www.zakonyprolidi.cz\/cs\/2000-240<\/p><p>[35] \u010cR. Na\u0159\u00edzen\u00ed vl\u00e1dy \u010d. 432\/2010 Sb. Na\u0159\u00edzen\u00ed vl\u00e1dy o krit\u00e9ri\u00edch pro ur\u010den\u00ed prvku kritick\u00e9 infrastruktury. V: Sb\u00edrka z\u00e1kon\u016f. https:\/\/www.zakonyprolidi.cz\/cs\/2010-432<\/p><p>[36] IAEA. Assessment of Defence in Depth for Nuclear Power Plants. In: Safety Report Series No. 46. ISBN 92\u20130\u2013114004\u20135. Vienna: IAEA, 2005, 119 s.<\/p><p>[37] IEC. ISA IEC 62443-4-1. Security for Industrial Automation and Control Systems, Part 4-1: Secure Product Development Lifecycle Requirements. Geneva: IEC 2018.<\/p><p>[38] INCOSE. [online]. 2020 [cit. 2020-12-23]. Dostupn\u00e9 z: https:\/\/www.incose.org\/products-and-publications\/sos-primerh<\/p><p>[39] BOARDMAN, J., SAUSER, B. System of Systems \u2013 the Meaning of of. V: IEEE\/SMC International Conference on System of Systems Engineering. Los Angeles: CA, 2006. 6 s. doi: 10.1109\/SYSOSE.2006.1652284<\/p><p>[40] KERTIS, T., PROCH\u00c1ZKOV\u00c1, D. Reduce of Criticality of Critical Infrastructure Facilities in the Railway Domain. V: Smart Cities Symposium Prague 2015 Proceedings \u2013 Czech Technical University in Prague. Praha: IEEE 2015. Str. 1-4. doi: 10.1109\/SCSP.2015.7181565.<\/p><p>[41] PROCH\u00c1ZKOV\u00c1, D., PROCH\u00c1ZKA, J., LUKAVSK\u00dd, J., BERAN, V., \u0160INDLEROV\u00c1, V. \u0158\u00edzen\u00ed rizik proces\u016f spojen\u00fdch se zhotoven\u00edm technick\u00e9ho d\u00edla a jeho uveden\u00edm do provozu. ISBN 978-80-01-06609. Praha: \u010cVUT 2019, 207 s. http:\/\/hdl.handle.net\/10467\/8446634<\/p><p>[42] IAEA. IAEA Safety Glossary: 2018 Edition. Vienna: IAEA 2018. 261 s. Dostupn\u00e9 z: https:\/\/www.iaea.org\/publications\/11098\/iaea-safety-glossary\u00022018-edition<\/p><p>[43] PROCH\u00c1ZKOV\u00c1, D., KERTIS, T., PROCHAZKA, J., PROCHAZKA, Z. \u017deleznice \u2013 jejich rizika a n\u00e1stroje pro \u0159\u00edzen\u00ed bezpe\u010dnosti. V: \u0158\u00edzen\u00ed rizik proces\u016f spojen\u00fdch s technick\u00fdmi d\u00edly. ISBN 978-80-01-06515-0. Praha: \u010cVUT 2018, s. 128-169.<\/p><p>[44] BOSSEL, H. Systeme, Dynamik, Simulation \u2013 Modellbildung, Analyse und Simulation komplexer Systeme. ISBN 3-8334-0984-3. Norderstedt\/Germany: Books on Demand 2004, 400 s.<\/p><p>[45] PROCH\u00c1ZKOV\u00c1, D. Study of Disasters and Disaster Management. ISBN 978-80-01-05246-4. Praha: \u010cVUT 2013. 202 s.<\/p><p>[46] OECD. Guidance on Safety Performance Indicators. Guidance for Industry, Public Authorities and Communities for developing SPI Programmes related to Chemical Accident Prevention, Preparedness and Response. Paris: OECD 2002, 191 s.<\/p><p>[47] KERTIS, T., PROCH\u00c1ZKOV\u00c1, D. Description of Safety Management Systems in Transportation. V: Journal of Environmental Protection, Safety, Education and Management Vol.5, No 9, June 2017. ISSN 2453-9813 (Online) DeGruyter 2017, DOI https:\/\/doi.org\/10.1515\/jepsem-2017-0003<\/p><p>[48] KERTIS, T. Introduction of Modern Approaches of Ensuring Safety into Business Processes in Railway Industry. V: Vybran\u00e1 rizika podnikov\u00fdch proces\u016f 2015. ISBN 978-80-01-05831-2. Praha: \u010cVUT, s 26-38.<\/p><p>[49] \u010cR. \u010cSN EN ISO 9001:2015 (01 0321). Syst\u00e9my managementu kvality \u2013 Po\u017eadavky. Praha: \u00daNMZ 2016.<\/p><p>[50] \u010cR. \u010cSN EN 61508-1 ed. 2 (180301). Funk\u010dn\u00ed bezpe\u010dnost elektrick\u00fdch\/elektronick\u00fdch\/programovateln\u00fdch elektronick\u00fdch syst\u00e9m\u016f souvisej\u00edc\u00edch s bezpe\u010dnost\u00ed \u2013 \u010c\u00e1st 1: V\u0161eobecn\u00e9 po\u017eadavky. Praha: \u00daNMZ, 2011.<\/p><p>[51] \u010cR. Z\u00e1kon \u010d. 181\/2014, Z\u00e1kon o kybernetick\u00e9 bezpe\u010dnosti a o zm\u011bn\u011b souvisej\u00edc\u00edch z\u00e1kon\u016f (z\u00e1kon o kybernetick\u00e9 bezpe\u010dnosti). Sb\u00edrka z\u00e1kon\u016f. http:\/\/www.zakonyprolidi. cz\/cs\/2014-181<\/p><p>[52] \u010cR. \u010cSN ISO\/IEC 27000 (36 9790) Informa\u010dn\u00ed technologie \u2013 Bezpe\u010dnostn\u00ed techniky \u2013 Syst\u00e9my \u0159\u00edzen\u00ed bezpe\u010dnosti informac\u00ed \u2013 P\u0159ehled a slovn\u00edk. Praha: \u00daNMZ, 2010<\/p><p>[53] IEC. IEC TS 62443-1-1:2009 Industrial Communication Networks \u2013 Network and System Security \u2013 Part 1-1: Terminology, Concepts and Models. ISBN 978-2-88910-710-0. Geneva: IEC 2009.<\/p><p>[54] \u010cR. \u010cSN ISO\/IEC 15408-1 Informa\u010dn\u00ed technologie \u2013 Bezpe\u010dnostn\u00ed techniky \u2013 Krit\u00e9ria pro hodnocen\u00ed bezpe\u010dnosti IT \u2013 \u010c\u00e1st 1: \u00davod a v\u0161eobecn\u00fd model. Praha: \u010cNI 2001.<\/p><p>[55] \u010cR. P\u0159edpisy. Leteck\u00e1 informa\u010dn\u00ed slu\u017eba [online]. Praha: \u0158\u00edzen\u00ed letov\u00e9ho provozu \u010cesk\u00e9 republiky. http:\/\/lis.rlp.cz\/predpisy\/predpisy\/index.htm<\/p><p>[56] EU. DIRECTIVE 2004\/49\/EC OF THE EUROPEAN PARLIAMENT AND OFTHE COUNCIL of 29 A pril 2004 on safety on the Community\u2019s railways and amending Council Directive 95\/18\/EC on the licensing of railway undertakings and Directive 2001\/14\/EC on the allocation of railway infrastructure capacity and the levying of charges for the use of railway infrastructure and safety certification (Railway Safety Directive). Brussels: EC, 2002.<\/p><p>[57] EU. Commission Implementing Regulation (EU) No 402\/2013 of 30 April 2013 on the common safety method for risk evaluation and assessment and repealing Regulation (EC) No 352\/2009 Text with EEA relevance. Brussels: EC, 2013.<\/p><p>[58] \u010cR. Vyhl\u00e1\u0161ka \u010d\u00edslo 376\/2006 Sb. o syst\u00e9mu bezpe\u010dnosti provozov\u00e1n\u00ed dr\u00e1hy a \u017eelezni\u010dn\u00ed dopravy a postupech p\u0159i vzniku mimo\u0159\u00e1dn\u00fdch ud\u00e1lost\u00ed na dr\u00e1h\u00e1ch.<br \/>Dostupn\u00e9 z: https:\/\/www. zakonyprolidi.cz\/cs\/2006-376<\/p><p>[59] UNIFE. IRIS International Railway Industry Standard. Brussles: UNIFE, 2012. Dostupn\u00e9 z: http:\/\/www.iris-rail.org\/<\/p><p>[60] \u010cR. \u010cSN EN 50126-1 (333502). Dr\u00e1\u017en\u00ed za\u0159\u00edzen\u00ed \u2013 Stanoven\u00ed a prok\u00e1z\u00e1n\u00ed bezporuchovosti, pohotovosti, udr\u017eovatelnosti a bezpe\u010dnosti (RAMS) \u2013 \u010c\u00e1st 1: Generick\u00fd proces RAMS. Praha: \u00daNMZ, 2019.<\/p><p>[61] \u010cR. \u010cSN EN 50129 (34 2675). Dr\u00e1\u017en\u00ed za\u0159\u00edzen\u00ed \u2013 Sd\u011blovac\u00ed a zabezpe\u010dovac\u00ed syst\u00e9my a syst\u00e9my zpracov\u00e1n\u00ed dat \u2013 Elektronick\u00e9 zabezpe\u010dovac\u00ed syst\u00e9my. Praha: \u010cNI, 2003.<\/p><p>[62] \u010cR. \u010cSN EN 50128 ED.2 (34 2680). Dr\u00e1\u017en\u00ed za\u0159\u00edzen\u00ed \u2013 Sd\u011blovac\u00ed a zabezpe\u010dovac\u00ed syst\u00e9my a syst\u00e9my zpracov\u00e1n\u00ed dat \u2013 Software pro dr\u00e1\u017en\u00ed \u0159\u00eddic\u00ed a ochrann\u00e9 syst\u00e9my. Praha: \u00daNMZ, 2012.<\/p><p>[63] KERTIS, T., PROCH\u00c1ZKOV\u00c1, D. Cyber Security of Underground Railway System Operation. V: Smart Cities Symposium Prague (SCSP). Prague, 25.05.2017 \u2013 26.05.2017. ISBN 978-1-5386-3825-5. Praha: \u010cVUT 2017, s. 1-4<\/p><p>[64] MOOS, P., MALINOVSK\u00dd, V. Informa\u010dn\u00ed syst\u00e9my a technologie. ISBN 80-903298-5-3. Praha: \u010cVUT Fakulta dopravn\u00ed. 2006.<\/p><p>[65] KERTIS, T., PROCHAZKOVA, D. Informa\u010dn\u00ed v\u00fdkon a kybernetick\u00e9 p\u0159\u00ed\u010diny dopravn\u00edch nehod. V: \u0158\u00edzen\u00ed rizik proces\u016f spojen\u00fdch s technick\u00fdmi d\u00edly. Praha, 07.12.2017. SBN 978-80-01-06351-4. Praha: \u010cVUT 2017, s. 44-59.<\/p><p>[66] VITOUS, M. Cobit 5 v mal\u00fdch a st\u0159edn\u00edch firm\u00e1ch. V: IT Systems: specializovan\u00fd m\u011bs\u00ed\u010dn\u00edk o podnikov\u00e9 informatice. Brno: CCB 2000.<\/p><p>[67] SVOBODA, V., SV\u00cdTEK, M. Telematika nad dopravn\u00edmi s\u00edt\u011bmi. ISBN 80-01-03087-3. Praha: \u010cVUT 2004, 263 s.<\/p><p>[68] PROCH\u00c1ZKOV\u00c1, D., SRP, J., PROCH\u00c1ZKA, J. Analysis of Cyber Networks in a System Concept. V: Proceedings of the 2013 International Conference on Systems, Control, Signal Processing and Informatics. Recent Advances in Systems, Control, Signal Processing and Informatics. ISBN 978-1-61804-204-0, Rhodes Island: Europment 2013, s. 102-109.<\/p><p>[69] MOOS, P., ZELINKA, T., MALINOVSK\u00dd, V. Telekomunika\u010dn\u00ed slu\u017eby. ISBN 978-80-01-03598-6. Praha: \u010cVUT 2007, 176 s.<\/p><p>[70] KERTIS, T., PROCH\u00c1ZKOV\u00c1, D. Parameters Strengthening Information Power Supporting the Rail Systems Safety. In: Safety and Reliability \u2013 Safe Societies in a Changing World, Proceedings of ESREL 2018, June 17-21, 2018, Trondheim Norway. London: CRC Press 2018. doi: https:\/\/doi.org\/10.1201\/9781351174664<\/p><p>[71] EU. Projekt SESAMO: Security and Safety Modelling [online]. ARTEMIS Joint Undertaking, c2012-2017 [cit. 2020-12-23]. Dostupn\u00e9 z: http:\/\/sesamo\u0002project.eu\/ [72] KOLEKTIV PRACOVN\u00cdK\u016e METROPROJEKTU PRAHA A. S. Publikace IV. C2. 2008. Praha: DISKUS DATASERVIS, spol. s r.o. 2008. Dostupn\u00e9 z: https:\/\/www.praha.eu\/public\/0\/a3\/da\/186337_4_Publikace_IV._C2.pdf<\/p><p>[73] KERTIS, T., PROCH\u00c1ZKOV\u00c1, D. Impacts of Lacks in Design of Control Systems in Rail Transportation. V: 2018 Smart City Symposium Prague (SCSP), Prague, 2018, Praha: IEEE 2018. s. 1-6. DOI: 10.1109\/SCSP.2018.8402668.<\/p><p>[74] CENELEC. EN 62290-1: Railway Applications. Urban Guided Transport Management and Command\/control Systems. System principles and fundamental concepts. Brussels: EC for Electrotech. Standardization 2014.<\/p><p>[75] \u010cR. \u010cSN EN 62267 (333532) Dr\u00e1\u017en\u00ed za\u0159\u00edzen\u00ed \u2013 Automatizovan\u00e1 m\u011bstsk\u00e1 doprava s vyhrazenou vodic\u00ed dr\u00e1hou (AUGT) \u2013 Bezpe\u010dnostn\u00ed po\u017eadavky. Praha: \u00daNMZ, 2010.<\/p><p>[76] \u010cR. \u010cSN EN 50159 (34 2670). Dr\u00e1\u017en\u00ed za\u0159\u00edzen\u00ed \u2013 Sd\u011blovac\u00ed a zabezpe\u010dovac\u00ed syst\u00e9my a syst\u00e9my zpracov\u00e1n\u00ed dat \u2013 Komunikace v p\u0159enosov\u00fdch zabezpe\u010dovac\u00edch syst\u00e9mech. Praha: \u00daNMZ, 2011.<\/p><p>[77] KERTIS, T., PROCH\u00c1ZKOV\u00c1, D. Risk Management Plan for Metro Station. In: Risk, Reliability and Safety. Innovating Theory and Practice. 26th European<br \/>Safety and Reliability Conference ESREL 2016. Glasgow, 25.09.2016 \u2013 29.09.2016. ISBN 978-1-138-02997-2. Lond\u00fdn: Taylor &amp; Francis Group. 2017,<br \/>s. 209-217.<\/p><p>[78] KERTIS, T., PROCH\u00c1ZKOV\u00c1, D. Judgement of Level of Integral Safety that Ensured the Risk Management Plan for Metro Station Operation. V: Global<br \/>Existential Risks. Bratislava, 15.11.2016. ISBN 978-80-89753-10-9. \u017dilina: STRIX n.f., \u017dilina. 2017, s. 39-51.<\/p><p>[79] PROCH\u00c1ZKA, J., KERTIS, T., PROCH\u00c1ZKOV\u00c1, D. Zdroje rizik pro dopravu na \u017eeleznici v \u010cR. In: JuFos 2017. Junior Forensic Science Brno 2017. Brno,<br \/>16.04.2017. ISBN 978-80-214-5486-6. Brno: Vysok\u00e9 u\u010den\u00ed technick\u00e9 v Brn\u011b, \u00dastav soudn\u00edho in\u017een\u00fdrstv\u00ed, 2017, s. 283-291.<\/p><p>[80] KERTIS, T., PROCH\u00c1ZKOV\u00c1, D. Railway Accidents in the Czech Republic, Causes of Risks and their Mitigation. V: Safety and Reliability \u2013 Theory and<br \/>Applications. ESREL 2017. Portoroz, 18.06.2017 \u2013 22.06.2017. ISBN 978-1-138-62937-0. London: Taylor &amp; Francis. 2018, s. 1667-1673.<\/p><p>[81] KERTIS, T., PROCH\u00c1ZKOV\u00c1, D. Posouzen\u00ed kriti\u010dnosti pl\u00e1nu \u0159\u00edzen\u00ed rizik pro metro. V: Rizika podnikov\u00fdch proces\u016f 2016. D\u011b\u010d\u00edn, 10.11.2016. ISBN 978-80-01-06033-9. Praha: \u010cVUT v Praze, Fakulta dopravn\u00ed, s. 60-75.<\/p><p>[82] KERTIS, T., PROCH\u00c1ZKOV\u00c1, D. Judgement of Conformity Level of Legislation with the Normative for Ensuring the Safety of Railway Systems from the perspective of Integral Safety. In: ExFoS 2017 \u2013 Expert Forensic Science 2017. Brno, 27.01.2017 \u2013 28.01.2017. ISBN 978-80-214-5459-0. Brno: Vysok\u00e9 u\u010den\u00ed technick\u00e9 v Brn\u011b, \u00dastav soudn\u00edho in\u017een\u00fdrstv\u00ed 2017, s. 368-374.<\/p><p>[83] PROCH\u00c1ZKOV\u00c1, D., PROCH\u00c1ZKA, J., KERTIS, T. Domains of Railway Traffic in the Czech Republic, which need the Safety Improvement. V: Vol. 11<br \/>(2017): Modernization of Railway \u2013 IRICoN 2017. Praha, 10.05.2017. ISBN 978-80-01-06297-5 (online). Praha: Acta Polytechnica CTU Proceedings 2017, s. 53-62. https:\/\/doi.org\/10.14311\/APP.2017.11.0053<\/p><p>[84] KERTIS, T., PROCH\u00c1ZKOV\u00c1, D., PROCH\u00c1ZKA, J., PROCH\u00c1ZKA, Z. Rizika spojen\u00e1 s provozem na \u017eeleznici. V: Sborn\u00edk p\u0159\u00edsp\u011bvk\u016f konference Young Transportation Engineers Conference 2018. ISBN 978-80-01-06464-1. Praha: \u010cVUT 2018, s. 1-9.<\/p><p>[85] VOTRUBA, Z., KALIKA, M., KLE\u010c\u00c1KOV\u00c1, J. Syst\u00e9mov\u00e1 anal\u00fdza. Praha: \u010cVUT 2004, 187 s.<\/p><p>[86] KN\u00c1PEK, J. P\u0159edn\u00e1\u0161ky k p\u0159edm\u011btu Syst\u00e9mov\u00e9 in\u017een\u00fdrstv\u00ed. Praha: \u010cVUT 2012.<\/p><p>[87] BODE, H. W. Network Analysis and Feedback Amplifier Design. New York: Van Nostrand 1945. 551 s.<\/p><p>[88] GEHER, K. Theory of Network Tolerances. Budapest: Akademiai Kiado 1971, 184 s.<\/p><p>[89] GEHER, K. The Theory of Sensitivity Invariants and Their Application to Optimization of Tolerances and Noises. V: Periodica Polytechnica. Budape\u0161\u0165: Institute of Telecommunication and Electronics, Technical University Budapest 1974, s. 25-34.<\/p><p>[90] GAJDO\u0160\u00cdK, L. Po\u010d\u00edta\u010dov\u00e1 identifikace obvod\u016f. Studijn\u00ed podpora. ISBN 978-80-248-1483-4. Ostrava: V\u0160B-TUO 2007, 149 s.<\/p><p>[91] KOL\u00c1\u0158, J. Grafy. Praha: \u010cVUT 1984, 231 s.<\/p><p>[92] GEPHI \u2013 The Open Graph. Gephi.org. 2017. https:\/\/gephi.org\/<\/p><p>[93] FRUCHTERMAN, T. M. J., &amp; REINGOLD, E. M. Graph Drawing by Force\u0002Directed Placement. V: Software: Practice and Experience. John Wiley &amp;<br \/>Sonns 1991, s. 1129-1164. https:\/\/doi.org\/10.1002\/spe.4380211102<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Pou\u017eit\u00e1 literatura pro \u010dl\u00e1nky Integr\u00e1ln\u00ed bezpe\u010dnost [1] KERTIS, T., PROCH\u00c1ZKOV\u00c1, D. Assets of Model Metro Station and Their Criticality. Acta [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3804,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[295,182],"tags":[],"class_list":["post-1492","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-integral-safety-definice","category-integralni-bezpecnost"],"_links":{"self":[{"href":"https:\/\/www.kint.cz\/ca\/wp-json\/wp\/v2\/posts\/1492","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.kint.cz\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.kint.cz\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.kint.cz\/ca\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.kint.cz\/ca\/wp-json\/wp\/v2\/comments?post=1492"}],"version-history":[{"count":9,"href":"https:\/\/www.kint.cz\/ca\/wp-json\/wp\/v2\/posts\/1492\/revisions"}],"predecessor-version":[{"id":3767,"href":"https:\/\/www.kint.cz\/ca\/wp-json\/wp\/v2\/posts\/1492\/revisions\/3767"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kint.cz\/ca\/wp-json\/wp\/v2\/media\/3804"}],"wp:attachment":[{"href":"https:\/\/www.kint.cz\/ca\/wp-json\/wp\/v2\/media?parent=1492"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.kint.cz\/ca\/wp-json\/wp\/v2\/categories?post=1492"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.kint.cz\/ca\/wp-json\/wp\/v2\/tags?post=1492"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}